mahirbuilds Contact

Build log

Jarvis HUD glasses, day zero

Work on the glasses starts on Saturday, October 17, 2026. This entry is the line in the sand: what version 1 has to do, written before any part is ordered, so every later entry can be checked against it.

What version 1 has to do

  • A proactive Jarvis agent. The glasses connect to Base Camp, the agent system I already run my work through, so the assistant can bring something up before I ask for it.
  • All-day wear. Light enough to keep on from morning to night.
  • An outdoor and climbing HUD. A heads-up display built for being outside and on the wall.

How this log works

Entries are dated and short. Each one says whether a result was measured on the bench, simulated, or is still a plan.